The roof is made of galvanized iron sheet on a pitch sloping steel truss.
The entire building sits on reinforced concrete pad foundations.
This was erected sometime in 2004. I made the structural analysis and drawings in UK and then when I came home for a home visit the construction begun. It took about 9 months before this project was completed.
No comments:
Post a Comment