Building Contractors & Consulitng Engineers Barangay IV Malilipot Albay
Sunday, 23 November 2008
GTA Civils
I did not stay here for a long time since we relocated to Philippines by January of 2009.
Tuesday, 4 November 2008
Wednesday, 20 August 2008
Thursday, 24 July 2008
Monday, 14 July 2008
Level Invert Connection
In drainage the typical manhole connection is level soffit or stepped connection. That is the invert level of the main run is relatively lower than the incoming laterals.
This point is practically important to note because when your design has some degree of gradient or fall restriction then 50mm can make a difference.
For example if you are connecting a 100 diameter into a 150 diameter main run pipe then your computed invert level taken from the origin of the 100 diameter pipe should be 50mm lower. If you fail to add this additional 50mm into your design and if the invert level of the connection point does not have enough depth then this can be an issue in actual construction.
Tuesday, 17 June 2008
ICE - Academic Assessment

ICE is a globar organizations that promotes civil engineering all over the world.
To become a member you must have an educational base that is acceptable to them. If you took your civil engineering in UK universities you can be admitted easily or you might like to be a student member whilst you are studying.
However if you studied somewhere else, you have to apply first for academic assessment and once you satisfy their requirements you will be admitted as a Graduate member. Afterwards you can apply for a professional review so that you can upgrade your membership to that of a Chartered grade.
Tuesday, 6 May 2008
Planning Notice

This is particularly important when there are several parties working in one project specially if the Planning Architect is different from the Construction Architect.
There could be some very important requirements in the planning notice which may not be highlighted by the client and the planning arcitect but if they are not fulfilled they could result into massive claims and project delays.
One classic example is a required 'free zone' in front of a development which was only called up by the planning architect in a form of a very vague note while the other required easements were dimentioned accordingly. It's very unfortunate that such note had been overlooked and the consequence was a tremendous loss in time and money.
Planning notices are mostly available on line. Just log-in ot UK Planning website and browse around to access the property of your interest.
Friday, 18 April 2008
Falmer Stadium

It will be built in a greenfield site however drainage wise it will have no significant impact to the environment for effectively the site will still be greenfield. In other words there will be no additional surface water (rain) outflow to the existing public drainage system and foul water discahrge will be kept to very minimum.
Tuesday, 15 April 2008
CBR
Roads are normally designed in accordance to their category or traffic loading. The first 3 componets of which do not change a lot, i.e. in terms of thickness and grade but the sub-base and the capping layer are dependant on the soil CBR.
Below is a typical tarmac access road construction and a table for sub-base and capping layer with respect to CBR percentage. (just double click to see an enlarged version)

Sunday, 30 March 2008
PinoySites.org

Malilipot Builders is now listed in PinoySites.org. This website is a directory of Philipine related websites.
You can find Malilipot Builders in Personal Blog, Engineering and Technololgy, Civil And Construction page.
Friday, 21 March 2008
Mater Salutis College Seminary
Wednesday, 12 March 2008
City and Guilds

Saturday, 8 March 2008
Sunday, 24 February 2008
Loyola School of Theology

Saturday, 23 February 2008
Why Malilipot Builders?
Once in Manila I was riding on a bus when I happened to see a taxi bearing the name, Malilipot Taxi. As a Malilipotenyo, seing that taxi gave me a sense of pride.
When we found ourselves outside our home town, it wouold be nice if someone asks you, Taga sain ka? and you answered, Malilipot and then he or she could easily locate where Malilipot is.
Why Builders?
Apart from being the nature of the our business, Builders will re-live an organization founded by Arch Jesus Binaday called The Builders. If you are old as I am maybe you would still remember seeing sign posts (concrete three-sided post) bearing the name of the streets. It's their project as far as I remember.
In a sense it's my way of paying tribute to a dear mentor who gave me the chance to practice my engineering skill by letting me design the structure of the cantilever choir loft of our church.
Sunday, 17 February 2008
My Skill List
Can design road in accordance with local highway authority specifications and site’s soils properties.
Can design a drainage scheme for a new development with regards to foul and storm waters sewage.
Can produce drainage, road layouts and details using Autocad program.
Able to produce drainage design calculations (using Micro-Drainage program) which computes relevant drainage parameters like foul and surface water outflow, storm water storage volume, etc.
Can propose drainage solution where drainage issues such as limited available drainage capacity, poor site’s condition, and other drainage related problems.
Can design soakway, compute storage volume, soakage rate, design head, etc.
Structural Engineering
Can design structural elements for all type of materials, viz. RC concrete, steel, timber and masonry.
Can produce structural calculations using Pro-Beam and Pro-Steel program.
Can design both using plastic and elastic limit design.
Can design mass concrete, rc concrete foundations.
Can design and analyze pile foundations.
Can design gravity, RC concrete, and mechanically stabilised retaining walls.
Autocad Drafting
Can produce quality digital drawings using Autocad program. Can use Autocad basic and advance commands with ease and mastery.
Can produce drawing at an appropriate scale and ‘layers’. Can make use of block and external reference as necessary. Can use relevant and available ‘autolisp’ coomands.
Can assign appropriate pen assignments to layers and colors.
Saturday, 16 February 2008
Aquinas University, Legaspi City

Friday, 15 February 2008
Brighton University


Thursday, 14 February 2008
Hobart Homes Quezon City
Wednesday, 13 February 2008
Alan Hutton Associates
Monday, 11 February 2008
Meralco Industrial Engineering Services Corporation
I worked in MIESCOR for about 9 months in1996 as Civil Engineer 1.
Here I learned to operate autocad and MS Office program.
Hemsley Orrell Partnership
This is where I am currently working. After about six years at BEP I moved to Hemsley Orrel Partnership. I am assigned at the Civil Engineering Department.
My workload consists mainly of drainage and road designs.
Hop is one of the leading firms in the field of Civil and Structural Consulting Engineering in South East England.
We are currently designing structures and civil works for the proposed Falmer Football Stadium in Brighton.
HOP is a compamny with certification as Inverstor In People. They are currently sponsoring my MSc Civil Engineering in Brighton University.
Sunday, 10 February 2008
BEP Engineers
Thursday, 7 February 2008
Our Lady of Salvation Dormitory

Due to slenderness of the building about 20% of the building weight has been applied as lateral load to account for seismic loading.
This building has been completed early last year (2007) and is now housing about 40 boarders as of this time.
Wednesday, 6 February 2008
Angeles Building, Dr. Amando Cope College of Nursing
The roof is made of galvanized iron sheet on a pitch sloping steel truss.
The entire building sits on reinforced concrete pad foundations.
This was erected sometime in 2004. I made the structural analysis and drawings in UK and then when I came home for a home visit the construction begun. It took about 9 months before this project was completed.
My First Project

This is my first ever project. I was in my 5th year as a Civil Engineering student at Aquinas University when the late Arch. Jesus Binaday asked me to design the structure of a proposed cantilever choir loft.
Designing cantilever sturcture involves risk. If you commit an error, there is a great chance the structure will collapse. Imagine a table with only two legs, you would note that it's not easy to make it stand up. On the other hand a table with four legs, even weak ones, can still stand up.
The main loft is only supported with two columns concealed within the exsiting wall. As far as I remember this has been built sometime in early month of 1989, making it about 20 years old now.
Tuesday, 5 February 2008
Malilipot Builders
Malilipot Builders
From Inception to Completion, Malilipot Builders will help you build the house of your dream.
Quality does not always equal high cost.
Service takes more priority than profit.
Thanks for dropping by. Please come back for more details.